Shipping
| |
Product |
Standard Ship Time |
Quick-Ship Program |
|
| |
HVAC Coils Of All Types
|
4 – 5 Weeks |
10 Workday, 5 Workday or 3 Workday |
|
| |
Hot Water Duct Coils |
3 – 5 Days |
Not Applicable |
|
| |
Industrial Coils |
6 – 8 Weeks |
Not Applicable |
|
| |
Tube Bundlers & Heat Exchangers |
3 – 4 Weeks |
10 Workday or 5 Workday |
|
| |
Fan/Coil Units |
8 – 10 Weeks |
2 Week Ship or 4 Week Ship |
|
| |
Belt Drive Units |
8 – 10 Weeks |
2 Week Ship or 4 Week Ship |
|
| |
Central Station Units |
8 – 10 Weeks |
4 Week Ship — Check with USA Coil |
|
| |
Fluid Coolers |
3 – 4 Weeks |
Check with USA Coil |
|
5 WORK DAY SHIPMENT PROGRAM
A lot of the equipment that USA Coil & Air builds is specially made to order to meet your exact engineering requirements. USA offers a special 5 work day shipment at a premium on the following equipment. Premiums are higher for 5 work day ships than 10 work day ships.
- Any type of HVAC Coil-Hot Water, Steam, Chilled Water, DX, or Condenser.
- Tube Bundles, Tank Heaters & Heat Exchangers Steam or Hot Water.
- Selected Fan Coils & Accessories-See Option #4.
If you give USA Coil & Air your order, count forward 5 work days and USA Coil & Air will ship your equipment guaranteed on that day. If the equipment doesn't ship on time, then you don't pay the premium. You have to allow several days after shipment to deliver the equipment via common carrier, U.P.S., etc. USA can also ship via special trucker or air freight if you desire.
10 WORK DAY SHIPMENT PROGRAM
A lot of the equipment that USA Coil & Air builds is specially made to order to meet your exact engineering requirements. USA offers a special 10 work day shipment at a premium on the following equipment. Premiums are less for 10 work day ships than 5 work day ships.
- Any type of HVAC Coil-Hot Water, Steam, Chilled Water, DX, or Condenser.
- Tube Bundles, Tank Heaters & Heat Exchangers Steam or Hot Water.
If you give USA Coil & Air your order, count forward 10 work days and USA Coil & Air will ship your equipment guaranteed on that day. If the equipment doesn't ship on time, then you don't have to pay the premium. You have to allow several days after shipment to deliver the equipment via common carrier, U.P.S., etc. USA can also ship via special trucker or air freight if you desire.
4 WEEK SHIP PROGRAM (FAN COIL UNITS ONLY)
USA builds a wide variety of fan coils that we offer on either 5 work day ship programs or 4 week ship programs. Our normal shipment schedule is 10 to 14 weeks. Below is a rundown of why you might need fan coils quickly.
- Service or emergency jobs. 5 work day ship, most expensive.
- Design-build or service jobs-4 weeks ship, mid-range expensive.
- New construction/cost effective - no emergency, 10 to 14 weeks, least expensive.
USA has selected the following styles to ship in either 5 work day or 4 week ship programs.
- Horizontal Basic Units - 200 thru 2000 cfm.
- Horizonal Return Plenum Units - 200 thru 2000 cfm.
- Horizontal Exposed Deluxe Cabinet Units - 200 thru 1200 cfm.
- Vertical Basic Units - 200 thru 1200 cfm.
- Vertical Exposed Cabinet Units - 200 thru 1200 cfm.
- Vertical Slope Top Units - 200 thru 1200 cfm.
A wide variety of valve packages, thermostats and coil options are available on either of these (2) ship programs. |