Shipping

  Product Standard Ship Time Quick-Ship Program  
  HVAC Coils Of All Types
4 – 5 Weeks 10 Workday, 5 Workday or 3 Workday  
  Hot Water Duct Coils 3 – 5 Days Not Applicable  
  Industrial Coils 6 – 8 Weeks Not Applicable  
  Tube Bundlers & Heat Exchangers 3 – 4 Weeks 10 Workday or 5 Workday  
  Fan/Coil Units 8 – 10 Weeks 2 Week Ship or 4 Week Ship  
  Belt Drive Units 8 – 10 Weeks 2 Week Ship or 4 Week Ship  
  Central Station Units 8 – 10 Weeks 4 Week Ship — Check with USA Coil  
  Fluid Coolers 3 – 4 Weeks Check with USA Coil  

 

5 WORK DAY SHIPMENT PROGRAM
A lot of the equipment that USA Coil & Air builds is specially made to order to meet your exact engineering requirements. USA offers a special 5 work day shipment at a premium on the following equipment. Premiums are higher for 5 work day ships than 10 work day ships.

  • Any type of HVAC Coil-Hot Water, Steam, Chilled Water, DX, or Condenser.
  • Tube Bundles, Tank Heaters & Heat Exchangers Steam or Hot Water.
  • Selected Fan Coils & Accessories-See Option #4.

If you give USA Coil & Air your order, count forward 5 work days and USA Coil & Air will ship your equipment guaranteed on that day. If the equipment doesn't ship on time, then you don't pay the premium. You have to allow several days after shipment to deliver the equipment via common carrier, U.P.S., etc. USA can also ship via special trucker or air freight if you desire.

 

10 WORK DAY SHIPMENT PROGRAM

 

A lot of the equipment that USA Coil & Air builds is specially made to order to meet your exact engineering requirements. USA offers a special 10 work day shipment at a premium on the following equipment. Premiums are less for 10 work day ships than 5 work day ships.
  • Any type of HVAC Coil-Hot Water, Steam, Chilled Water, DX, or Condenser.
  • Tube Bundles, Tank Heaters & Heat Exchangers Steam or Hot Water.

If you give USA Coil & Air your order, count forward 10 work days and USA Coil & Air will ship your equipment guaranteed on that day. If the equipment doesn't ship on time, then you don't have to pay the premium. You have to allow several days after shipment to deliver the equipment via common carrier, U.P.S., etc. USA can also ship via special trucker or air freight if you desire.


4 WEEK SHIP PROGRAM (FAN COIL UNITS ONLY)

USA builds a wide variety of fan coils that we offer on either 5 work day ship programs or 4 week ship programs. Our normal shipment schedule is 10 to 14 weeks. Below is a rundown of why you might need fan coils quickly.
  • Service or emergency jobs. 5 work day ship, most expensive.
  • Design-build or service jobs-4 weeks ship, mid-range expensive.
  • New construction/cost effective - no emergency, 10 to 14 weeks, least expensive.

USA has selected the following styles to ship in either 5 work day or 4 week ship programs.

  • Horizontal Basic Units - 200 thru 2000 cfm.
  • Horizonal Return Plenum Units - 200 thru 2000 cfm.
  • Horizontal Exposed Deluxe Cabinet Units - 200 thru 1200 cfm.
  • Vertical Basic Units - 200 thru 1200 cfm.
  • Vertical Exposed Cabinet Units - 200 thru 1200 cfm.
  • Vertical Slope Top Units - 200 thru 1200 cfm.

A wide variety of valve packages, thermostats and coil options are available on either of these (2) ship programs.

AHRI Performance Certified USA Coil Newsletters Shipping Schedule
Coil Selection Program

HVAC Coils

|

Hot Water Duct Coils

|

Industrial and Process Coils

|

Fluid Coolers

|

Central Station Air Handlers

|

Quick Ship Fan Coil Units

Stock Fan Coil Units

|

Belt Drive Air Handlers

|

Rooftop Air Handlers

|

Replacement Tube Bundles and Heat Exchangers

Operation and Maintenance Instructions

|

Home

|

Product Line

|

Print Product Literature

|

Request Product Literature

Shipping Schedule

|

Contact Us

|

Rep Locations

|

Coil Selection Program

|

Newsletters

|

Site Guide

 

|